Site Allocations Plan March 2016

List Comments

Search for Comments

Response Type
Order By
in order

5 comments.

List of comments
RespondentResponse DateDetails
North Somerset Levels IDB 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Portishead South west of Severn Paper Mill

  • Comment ID: 11734177//54
NSLIDB see detailed comments
Deleted User 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Portishead South west of Severn Paper Mill

  • Comment ID: 14980897//1
Support for inclusion of land south of Severn Paper Mill, Portishead as a residential allocation.
Environment Agency 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Portishead South west of Severn Paper Mill

  • Comment ID: 1020673//22
Fluvial and Tidal Flood Zone 3, FRA should investigate flood compensation, floor levels with no sleeping on the ground floor.
North Somerset Levels IDB 28 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Portishead South west of Severn Paper Mill

  • Comment ID: 11734177//59
NSLIDB Current Comment see detail
North Somerset Flood Risk Mana… 26 Apr 2016

Site Allocations Plan March 2016 Schedule 1: Proposed large sites for residential development over 10 dwellings (Sites marked with a * are mixed use sites). Portishead South west of Severn Paper Mill

  • Comment ID: 14550881//66
Having looked at the site from an ordinary watercourse, surface water and ground water flooding point of view we have the following comments: Drainage Category 2 - The site could be drained by sustainable drainage, however there are constraints and these need to be considered in the design Reason – 30% reduction in runoff required - Poorly draining