Site Allocations Plan March 2016

Document Section Site Allocations Plan March 2016 PUT FORWARD A SITE OR MAKE GENERAL COMMENTS Put forward a site [View all comments on this section]
Comment ID 14839937//5
Respondent Deleted User [View all comments by this respondent]
Response Date 04 May 2016
Comment

The Sites already allocated, Hallam and Perssimon need to be properly joined up with these proposed allocations in order for a coherent development to be formed that can principally be served from the large Arnolds Way roundabout. All sites need to be joined to the Multi-use pathways proposed along both sides of Northend. The above needs to be achieved by agreement and conditioned so that all talk of “ransom strips” is avoided.

 

The descriptions below need to be read with the relevant plans. Landowner approval has been gained for the proposals apart from path routes shown dotted and these will be consulted on over the coming weeks.

 

Site E,F,G” The Bridge Ground

Opposite the Bridge Inn and Smiths Forge Business Park 35 Acres.

A mixed use, consisting of:

Playing fields and Sports Club House with Community Facilities for Functions, Meetings, Village Markets and Youth Clubs. The sports facilities will house Yatton Rugby Club that relocates from site “A”.

The site is connected to the Multi-use path and other pathways to be formed. Along with these there will be a Perimeter Jogging Track of 1500m (1 Mile) that will run in the surrounding tree planting.

A commercial zone “E” to the south, with provision for a medical facility and some small offices in a low cow shed designed building constructed with the demolition stone from Box bush farm, site D.

A car park “G” to serve all users including possible school site “H”

 

 

Attachments